Industrial IoT · Tangier, Morocco
Turn your production line into a real‑time digital twin
Connect machines. See OEE. Find downtime. Make better production decisions.
7–10 days · Free · No commitment
System integrator? Add a production layer to your projects
OEE
79.0%
- Availability
- 87.2%
- Performance
- 92.4%
- Quality
- 98.1%
Illustrative OEE of 79.0%, with availability, performance and quality shown as three separate bars.
Parts per hour · target 120
Illustrative bar chart of parts produced per hour across one shift, compared with a target of 120.
Machine status
- Press 01Running
- Press 02Running
- Welding 01Fault
- Assembly 01Running
- Inspection 01Stopped
- Packaging 01Planned stop
Illustrative list showing the current state of six machines: running, stopped, fault or planned stop.
Illustrative example — simulated data, not customer data.
5+
years delivering industrial software in production
- MES
- OEE
- IIoT
- Platforms
- Rockwell FactoryTalk
- PTC ThingWorx
- Iotellect
- Experience in
- Truck manufacturing
- Pharmaceutical manufacturing
01 — The situation
Your production data is not working for you yet
Before
- PLC
- SCADA
- Excel
- MES
- Manual reports
- Production meeting
“Why did we lose time?”
- Manual data entry
- Limited visibility
- Hidden downtime
- Siloed systems
With TioTech
- PLC
- SCADA
- MES
- ERP
TioTech
- OEE
- Downtime
- Action
Stops recorded with their cause and duration — not reconstructed the next morning.
- No replacement of your automation
- One line first, then the plant
- Reporting by shift, workshop and site
02 — What we deliver
Six blocks, on your existing equipment
Machine connectivity
PLCs, sensors, equipment and legacy machines.
Production tracking
Machine states, activity, alarms and operating KPIs.
OEE dashboards
Availability, performance, quality and your other KPIs.
Downtime analysis
Capture and visualise stops to target losses.
Data integration
Links to SCADA, MES, ERP, BI and custom systems.
Custom applications
Dashboards, alerts, reports and workflows built for you.
Each block is an engineering project on your equipment — not a product to buy.
03 — Downtime analysis
Two causes = 67% of lost minutes
Stops by cause (minutes) · Shift A
Total: 104 minutes of downtime on the shift
Illustrative Pareto chart ranking downtime causes by minutes lost.
What the line is telling you
10:00 – 11:00
96 parts against a target of 120: the line falls behind.
Cause
Tool change (42 min) and material shortage (28 min).
End of shift
The manager targets these two causes, backed by data.
Outcome
A prioritised action instead of a debate over manual logs.
04 — Free digital-twin demonstrator
See your production line before you connect it
Describe one line. We build a digital twin of it, driven by realistic simulated data — so you see the result before any integration project.
01
You give us
- A description of the line
- 3 to 5 machines
- 5 to 10 KPIs
- Approximate cycle times
- Typical downtime causes
02
We build
- Simulated machines (PLC-like data)
- OEE and downtime dashboards
- A realistic shift scenario
03
You get
- A 30-minute online demonstration
- Your line, your KPIs, your terms
- No commitment
05 — The approach
One step at a time, each with a deliverable
- 07–10 days · free
Demonstrator
Your simulated line and its dashboards.
Deliverable30-min demo
- 1≈ 4 weeks
Single-line pilot
Connect, collect, visualise and evaluate on real machines.
DeliverableMeasured results
- 2Scope-dependent
Plant rollout
Extend to other lines and workshops.
DeliverableConsolidated plant view
- 3Scope-dependent
Multi-site
Reporting by shift, workshop and site.
DeliverableMulti-site steering
Pilot duration is indicative, depending on equipment access and plant environment.
06 — The technology
Powered by Iotellect, delivered by TioTech
- The platform
- IotellectEquipment connectivity, industrial protocol support, data storage, visualisation and tools for building industrial applications.
- Our role
- TioTechAssessing your equipment, connecting it, modelling your production data and building the views your teams use.
- Connectivity
- Industrial protocols
- Storage
- Supervision
- Automation
- Applications
07 — Track record
Experience already delivered in production
MES — truck manufacturing
Manufacturing execution system taken into production for truck manufacturing.
OEE — pharmaceutical manufacturing
Performance measurement across 4 workshops of 2 lines each, reported by period, shift, workshop and site.
Delivered under previous professional engagements. Client names are not disclosed.
08 — For system integrators
You keep the automation, we add the production layer
- TioTechProduction applicationOEE, downtime, tracking, dashboards, reports, MES / ERP links
- TogetherConnectivity and dataGateways, industrial protocols, data collection
- Your companyAutomation and fieldPLCs, SCADA, sensors, machines, commissioning
What you gain
- An extra offer on your existing projects
- A customer relationship that continues after commissioning
- Fewer dashboards to rebuild on every project
Next step
Show us one production line. We’ll build the demo.
Pick the path that fits you, then describe your line — we reply personally to arrange a 30-minute call.
Manufacturer
I run a production site
I want real-time visibility on my lines, my OEE and my downtime.
Build my free demonstratorSystem integrator
I deliver automation projects
I want to add OEE, downtime analysis and MES links to my offer.
Partner with TioTech- Tangier, Morocco
- contact@tiotech.ma